Discover what your property could become and what it takes to
get there. Feasa analyzes zoning, critical areas, utilities, and site
constraints to help you explore expanding your home, adding a backyard
home, splitting your lot, or developing single-family and multifamily
housing.
Get a clear report outlining your options, potential
roadblocks, and next steps before spending thousands on plans and studies.
Then ask Feasa questions about your results for personalized guidance to
help move your project forward.
Is the lot worth studies that cost thousands? Find
out first for $199.
Parcel 00000-000-000 · City of Olympia · sample report
Zoning
Zoned R-4, Low Density Residential. Minimum lot size in this
zone is 5,000 sq ft; this parcel is 8,400 sq ft (60 by 140 ft).
Overlays
Verified Critical areas overlay:
a mapped stream’s buffer reaches the rear corner of the parcel.
Unknown Critical areas report on file for
this parcel: none found in the jurisdiction's GIS layer.
The obvious constraints
Maximum structure height 35 ft in this zone.
Setbacks: 20 ft front, 5 ft side and rear.
Impervious surface capped at 55% of lot area.
That's what a Quick lookup answers: the rules that govern the parcel, not
what actually fits inside them. Feasibility takes the next
step: what fits here, and what stands in the way of building it.
Parcel 00000-000-000 · City of Olympia · sample report
What fits
A detached accessory structure fits.
The buildable envelope after setbacks and the stream buffer leaves
roughly 2,300 sq ft clear behind the house.
What stands in the way
Verified The stream buffer takes the
rear corner of the lot out of the buildable envelope entirely.
Inferred A drainage easement likely
crosses the south side of the lot. The plat doesn't show it, but the
neighboring parcel's does.
Unknown Soil report: nothing on
file for this parcel or its immediate neighbors.
What it takes
A critical areas review for the stream buffer, routine when the
structure stays outside it, 2–4 week turnaround.
A boundary survey, to confirm the easement question above before design
starts.
A standard building permit; no pre-application meeting required at this
size.
Feasibility answers what fits and what's in the way, not what it
costs, and not what the city's been saying about this area lately.
Fullscope adds both: a budget, and the civic record.
Parcel 00000-000-000 · City of Olympia · sample report
What fits
A detached accessory structure fits:
roughly 2,300 sq ft of buildable envelope behind the house, clear
of the stream buffer.
What stands in the way
Verified The stream buffer takes the
rear corner of the lot out of the buildable envelope entirely.
Inferred A drainage easement likely
crosses the south side of the lot. Confirm with a boundary survey
before design starts.
The numbers
Preliminary budget for a 1,200 sq ft detached structure. Vertical and
horizontal are kept apart because they move for different reasons, and
every line is an allowance until it is quoted.
Budget line
Estimate
Vertical: shell, interior and finishes (1,200 sq ft at $210–$260 per sq ft)
$252,000–$312,000
Horizontal: site prep, foundation excavation and drainage
$18,000–$26,000
Horizontal: sewer and water service extension
$14,000–$22,000
Fees: itemised below
$15,000–$21,500
Preliminary budget: roughly $299,000–$381,500.
Fees
Estimate
Critical areas review
$400–$800
Boundary survey
$1,800–$2,600
Building permit & plan review
$3,200–$4,100
Impact & utility connection fees
$9,600–$14,000
The civic record
Verified No active moratorium on
accessory structures in this jurisdiction as of the report date.
Inferred A pending code update would
raise the impact fee schedule roughly 8% if adopted before permitting.
The city council's next reading is scheduled, not yet voted.
This is everything Feasa looks at for one property: what fits, what's in
the way, what it would cost to build, and what the city might change
next.